INTERVIEW RESULTS FOR CONTRACT EMPLOYEE RECRUITMENT WITHIN THE SCOPE OF THE EU PROJECT

Within the scope of the “Improving Occupational Health and Safety Especially in Mining Sector Project (MISGEP)” financed by the Republic of Turkey and the European Union, interviews were held on 21-22-23 October 2020 for the recruitment of full-time contract employees.  Successful candidates are listed below.

The Directorate General of Occupational Health and Safety (DGOHS) has stated that no other notices will be sent to the candidates. DGOHS stated that they will contact the successful candidates regarding the start date of their employment, and the documents that are required.

Announcement Date: 17.02.2021

NAME – SURNAMEAPPLIED POSITION FINAL RESULT
ERDEM KARACAENGINEERMain
YAKUP MÜKELLEFENGINEERMain
HAMZA DALENGINEERMain
ERDİNÇ ÖZDOĞANENGINEERMain
EGEMEN SAYGINENGINEERMain
ÖZGÜR ODABAŞIENGINEERMain
ANIL BURAK SEÇGİNENGINEERMain
MESUT KAYAENGINEERMain
HAKAN AYENGINEERReserve
AHMET ERSİN ENGİNENGINEERReserve
MEHMET TANER ASLANTAŞENGINEERReserve
NECATİ HAKAN ÖNALENGINEERReserve
ALİ ÇELİKENGINEERReserve
UFUK AŞKINENGINEERReserve
RAHMİ KOCAMANENGINEERReserve
ALİ KIZGUTENGINEERReserve
BURAK ŞENGÜNENGINEERReserve
EZGİ ÜMİT PARALIENGINEERReserve
ŞULE YÜKSELPROJECT ASSISTANTMain
BAŞAK BİLGESU GELBALPROJECT ASSISTANTMain
CANSIN ÖZERPROJECT ASSISTANTReserve
ECE KURTULUŞPROJECT ASSISTANTReserve
ELİF GÖKÇE UÇKAÇPROJECT ASSISTANTReserve
HARİKA İNANPROJECT ASSISTANTReserve
ASİYE BÜŞRA DÜZGÜNPROJECT ASSISTANTReserve
OĞUZHAN KILIÇPROJECT ASSISTANTReserve
SALİM ERKMEN PALAZPROJECT ASSISTANTReserve